The third project in collaboration with Consto-Norway (one of the great local entrepreneurs) was a very special one.

Both by amplitude – with over 100 tons of Steel being used and complexity – a mixed steel / wood structure that starts from the ground up to over 15m high, sinusoidal, with a length of 260m.

We designed the execution details for the metal component, fabricated the metal structure and transported it to Norway, the assembly location of the complex. The components were delivered using 14 trucks.

Drop us a line

Send us an email address and/or a phone number,
and we’ll contact you for the details.