The project, until now, has been carried out in 3 stages. Stage 1 in 2013, stage 2 – the second metal hall in 2015 and the third metal hall in 2019.

On a surface of 10000sqm of land, Ikon Ideea built 3 metal halls, 150 tons of metallic preparation for each hall.

Ikon Ideea, as a general contractor, had the role of carrying out the technical projects, the execution details, the making of the metal confections as well as the assembly of the three metal halls and interior finishes. Each metal hall was handed over.


Drop us a line

Send us an email address and/or a phone number,
and we’ll contact you for the details.