Portfolio
Since the very first day we try to delivery best quality for our customers. Each step we take, each investment we make has as an end result an increase in quality of our deliverables. We learn from each project how to be better and how to come forward to our clients with new and innovative solutions.
Please find below a selection of our projects:
- Execution and erection of metallic structure, 120 to

- Flap gate Projectno 2.
- 2 unit Bearing system, side panels and seal system Weight 68 Ton
- 2 unit flap gate. Dim 4 x 15 meter. Wight 32 to pr unit total 64Ton
- 2 unit stop log and bridges 15meters. 23 T

Detail design, fabrication and delivery:
- Process and piping system. Surge chamber tank Ø 1200 and high pressure bypass system.Design pressure Pn 64. Stainless steel SS 304 and LDX Duplex.
Detail design, fabrication and delivery. Design pressure Pn 65, total 32Ton:
- 2 unitvertical Pelton turbine housing, distributors and wheel pit covers.
- 1 unit bifurcation
- 2 unitinlet pipe.

- 3D design, prefabrication and delivery, Cooling and drainage system.

Detail design, fabrication and delivery:
- 2 unit vertical Pelton housing and distributor including wheel pit cover. 32 Ton
- Auxiliary system. Ongoing Delivery April 2015.

- Fabrication of Gates metallic structure
- Bifurcation

- Engineering for production. Fabrication and delivery Pelton unit housing and distributor. Inlet diam 1200, inner cover and tools. 32 ton.

- Embedded parts - Cernavoda and Agigea
- Gates seal support – Cernavoda
- Sealing support PPSERV - Cernavoda
- Cylinder connection rod – Cernavoda and Agigea
- Platforms and Stairs – Cernavoda, Agigea and Ovidiu

Detail design, fabrication and delivery:
- Draft tube and draft tube gate, 11 Ton.
- High pressure bypass gate in Duplex. Dim 2 x 3 meter. Design pressure 85 m. Capacity 65M3/s. Total installation weight 34 T.
- Inlet pipe Ø 1200. 6 Ton

- Design fabrication and site installation of metallic structure for silo reinforcement, 30 to
- Execution and erection of metallic structure, 200 to
- Embedded parts - Cernavoda and Agigea
- Gates seal support – Cernavoda, 16 to
Detail design, fabrication and delivery:
- 1unit horizontal Pelton turbine housing with bifurcation and injection bend. 4T
- 1 unit inlet pipe. 3T. Ongoing delivery April 2015

Design fabrication and site installation including CE certificate.
- Buffer tank 100m3 SS304. Ø 3,6m x 10 m

- Design fabrication and installation engineered piping support system. (5 x ø800 and 5 x Ø600) All in Stainless steel. Ongoing to January 15.

Design fabrication and site installation of metallic structure for warehouse- 64to

- Fabrication of enclosing tube 2” and 6” spacers.
- EPC Process system SS steel Tank 600m3. Installation and commissioning.

Detail design, fabrication and delivery:
- Vertical Pelton housing and distributor including wheel pit cower. 6 Ton

Installation and site management project.
- Installation welding and anchoring inlet pipe Ø 5 meters. 32 meters Prior to embedding.
- Installation welding and anchoring Draft tube Ø 5 meters. Prior to embedding.
- Installation drainage piping system.
- Installation Stay ring and welding on spiral casing.

Detail design, fabrication and delivery:
- Flap gate 4 x 8 M. Side panels Duplex LDX. 12Ton
- Bearing system 13Ton

- Fabrication of components for 6” and 8” Columns.

- Detail design, production and delivery.
- Stop log system and bridge 8 meter - 23 Ton.

Detail design, fabrication and delivery:
- Vertical Pelton unit housing and distributor including wheel pit cower. 12 Ton

- Contract steelworker.
- About 45 t steel construction and assembly work of delivery and fender system.

- Engineering, 3D Design cooling and drainage system.
- 2 x 65MVA unit. Pelton turbine, generator and transformer.

- 1 unit expansion box system (between MIV and Inlet flange Pelton Turbine)
- Tverraa bukserØr: 1 unit bifurcation diam 1200 including inlet flange pipes and machining adapting flanges 12 ton

- Metallic structure for auto showroom, 300 to
- Contract assigned to week 17. delivery completed 06-2016.
- Delivery of Penstocks network manifolds Rosten PowerStation.
- 150 ton. Ø3m manifolds and high pressure Penstocks and past drop lift facilities.

- Execution of steel components for motorway, 30 to
- Execution of steel components for 40 m 3G Towers, 60 to
- Execution of steel components for motorway, 100 to
- Maintenance Valve and operation system. 205 unit butterfly valves DN250-DN700
- Maintenance 205 unit actuators pneumatic hydraulic operated.
- Dismantling from system, transported to Ikon Workshop for dismantling, surface treatment, and replacement of spare parts and testing. Transport to site and installation/Commissioning.
- Design fabrication and replacement of 406 splittflanges.

- 3D design, prefabrication and delivery, Cooling and drainage system.